Warning: date() [function.date]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Asia/Jayapura' for 'CST/9.0/no DST' instead in /home/reliable/public_html/content/project_page.php on line 26
Burnside Shopping Centre - Sydney Walk - Projects - Reliable Glass

Burnside Shopping Centre - Sydney Walk
Built by Sarah Construction
Project value:

Total new entry was created, and an exceptional two level coloured glass wall either side of the walk through was also added, this walkthrough is light filled and very smart looking with the fine touches of polished stainless steel dividing the glass panels which form the entry walls. New tenancies were also added to the eastern side and a commanding entry with stainless steel and glass balustrading, this same elevation also emcompassed the three level coloured glass fronted passenger lifts and retail tenancies adjacent the lifts. Glass was used in the high level entry areas to capture all the light and maintain a indoor outdoor feel.

Return to All Projects